Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
public:admin:make_selection_process [2024-07-04 08:59] Julien Delislepublic:admin:make_selection_process [2025-02-12 09:26] (current) Julien Delisle
Line 1: Line 1:
-====== MAKE interdisciplinary projects: selection process  ======+====== FUNDING - MAKE interdisciplinary projects: selection process  ======
  
 ==== Guidelines for the selection process ==== ==== Guidelines for the selection process ====
Line 13: Line 13:
 //**The operational committee:**//  //**The operational committee:**// 
   * Following the projects throughout the year and providing support if necessary. The operational committee provides recommendations to the strategic committee.    * Following the projects throughout the year and providing support if necessary. The operational committee provides recommendations to the strategic committee. 
-  * The operational committee can make recommendations to stop a project if safety issues are identified anytime.+  * The operational committee can make recommendations to stop a project if safety issues are identified at anytime.
   * The operational committee is composed of six members including representative of the VPT (durability), the AVP-SAO (student association) and the CCTC (transversal skills)   * The operational committee is composed of six members including representative of the VPT (durability), the AVP-SAO (student association) and the CCTC (transversal skills)
        
Line 27: Line 27:
 **//Project related criteria’s//** **//Project related criteria’s//**
  
-  * (mandatory) A good supervision by Professor and coordinator in charge as well as partner laboratories +  * (mandatory) A good supervision by an EPFL Professor and coordinator (EPFL employee) in chargeas well as multiple partner laboratories  
-  * The project feasibility: long term objectives are realistic (over a three-year period) and in line with EPFL pedagogical objectives and scientific disciplines +  * The project feasibility: long term objectives are challenging but realistic and in line with EPFL pedagogical objectives and scientific disciplines. Interdisciplinary projects are aiming to last at least 3 years. 
-  * The prototype to build is realistic with EPFL resources and existing prototyping network+  * The prototype to build is challenging and requiring multiple backgrounds but it is still realistic with the existing EPFL [[https://make.epfl.ch/resources |resources and prototyping network ]]
   * The budget (including sponsors) is realistic for the objectives set   * The budget (including sponsors) is realistic for the objectives set
   * Risks (financial, accident, EPFL image, etc.) shall be identified and mitigated properly   * Risks (financial, accident, EPFL image, etc.) shall be identified and mitigated properly
Line 35: Line 35:
 **//Pedagogical criteria’s//** **//Pedagogical criteria’s//**
  
-  * Learning by doing: the project should reinforce theoretical learning seen in courses through practical implementation.  +  * **Learning by doing**: the project should reinforce theoretical learning seen in courses through practical implementation.  
-  * Open ended: the project should offer the possibility for students to develop their creativity and to look for many different potential solutions +  * **Open ended**: the project should offer the possibility for students to develop their creativity and to look for many different potential solutions 
-  * Interdisciplinarity: favoring interdisciplinarity by allowing students from different backgrounds to contribute to the project. The prototype(s) to be produced must be complex enough to push students to make compromises between disciplines.  +  * **Interdisciplinarity**: favoring interdisciplinarity by allowing students from different backgrounds to contribute to the project. The prototype(s) to be produced must be complex enough to push students to make compromises between disciplines.  
-  * Transversal skills: the project must allow transversal skills development (group/human management, project management, knowledge management etc..).  +  * **Transversal skills**: the project must allow transversal skills development (group/human management, project management, knowledge management etc..).  
-  * Sustainability: The project must, as far as possible, lead students to consider the dimension of sustainability in their project. Ideally the students should develop a systemic approach in evaluating the impact of their developments or the solutions they propose.+  * **Sustainability**: The project must, as far as possible, lead students to consider the dimension of sustainability in their project. Ideally the students should develop a systemic approach in evaluating the impact of their developments or the solutions they propose.
  
-A given project can be very strong regarding a given criteria and less developed in another. For instance, a given project could be strongly focus on sustainability but not as interdisciplinary as other projects. None of these criteria are eliminatory (except the very first one) and this list aims at providing the project with a direction/goal, but it is not expected to excel in every criterion. Time management of students is also to consider as the workload on the side of classical courses is very high in MAKE projects.+A given project can be very strong regarding a given criteria and less developed in another. For instance, a given project could be strongly focusing on sustainability but not as interdisciplinary as other projects. None of these criteria are eliminatory (except the very first one) and this list aims at providing the project with a direction/goal, but it is not expected to excel in every criterion. Time management of students is also to consider as the workload on the side of classical courses is very high in MAKE projects.
  
 The strategic and operational committees will evaluate the global picture of every project to make their decisions. The strategic and operational committees will evaluate the global picture of every project to make their decisions.
Line 67: Line 67:
   * The operational committee collaborates with projects over the year. Members from this committee stay in close contact with projects needing support or improvement in a specific area (see under for more information)   * The operational committee collaborates with projects over the year. Members from this committee stay in close contact with projects needing support or improvement in a specific area (see under for more information)
  
 +The documents to submit early June, for a three year conditional support, are the following:
 +  * {{ :public:admin:make_submission_-_new.docx | The full submission document}}
 +  * {{ :public:admin:activity_report_make_projects_template.docx | The activity report }} (to be provided every year) 
  
  
  • public/admin/make_selection_process.1720083591.txt.gz
  • Last modified: 2024-07-04 08:59
  • by Julien Delisle